01 / Sample selection & candidate labels 26 October 2026 · Three study updates
142Corpus records
→
43Prepared debates
→
21Final analysis sample
The final sample contains two-candidate Democratic–Republican general-election debates with a viewer poll for the same event. Both grids below use these same 21 debates.
Same debates. One consistent candidate comparison.
Debatrix-based whole-debate scoring: all 16 score–poll correlations, before and after assigning the Democratic candidate to A and the Republican candidate to B.
Before · Original input order
Candidate A − Candidate B
A was Democratic in 13 debates and Republican in 8.
8 / 21 →debates recoded
Now · Same party direction
Democratic − Republican
A is Democratic; B is Republican in all 21 debates.
Same colour scale in both grids. * p < 0.05 · ** p < 0.01 · *** p < 0.001 (raw p).
Select a cell to highlight the matching result in both grids.
Both grids use the same 21 debates, saved LLM scores, and poll values. Both candidate differences were reversed for the eight Republican-first debates. The LLMs were not rerun for this comparison.
Original A/B assignment: The preprocessing code assigned Candidate A to the first speaker it identified as a candidate in the transcript, and Candidate B to the second. Some labels were later revised when candidate identities were corrected.
02 / A clearer purpose How five questions became three
Five questions, reorganized into three.
Earlier focus
How closely do scores match viewer polls?
→
Current aim
What do LLM debate scores reveal about surveyed viewers’ judgments?
Questions combined or carried forwardExisting ensemble analysis given a dedicated question
Short labels summarize the archived and current RQs. The current RQ1 also includes the exploratory Debatrix turn-by-turn comparison.
03 / Work status Saved records · 25–26 October · latest 05:03 Sydney
Completed, unresolved, running, and waiting.
Counts below are scoring units, not debates or retry attempts. The older three-seed remeasurement is separate from the 30-seed work.
Not failures in the new 30-seed runs. Their completion will not close this older queue. Recovery is required only if this three-seed remeasurement is retained as a complete analysis.
Debatrix turn-by-turn · Gemma 4New work for the other 20 debates
3,948 / 249,480
Debatrix turn-by-turn · GPT-OSSNew work for the other 20 debates
8,407 / 249,480
Debatrix turn-by-turn · DeepSeekDebate 010 · extra 10 seeds to reach 30
21,836 / 23,400
Recorded failed units: 0 in these four active queues. Gemma / GPT-OSS each reuse 70,200 completed units for debate 010. Both resumed after protective stops; the cause remains unresolved.
Waiting for inputs / next steps
Analyze, package, and finalize
Complete Whole-debate → run the queued 30-seed LOO ensembles.The existing main N=21 ensemble is already calculated.
Complete paired turn-by-turn jobs → merge 30 seeds.Check coverage; calculate means, standard deviations, preference stability, and poll correlations.
Finalize the reproducible workflow and manuscript.Package the fixed 21-debate Democratic / Republican configuration; update affected figures, tables, text, and appendices.
Code and documentation can be prepared while scoring continues. Final result integration follows the required completed inputs.
Earlier planning allowance: ~11 days or more. Based on the 25 October workload snapshot; not a live ETA.Saved UNSW records, not a new workstation check.